Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jul 15, 2009     Tail conduit mount - (1.6 hours)       Category: Fuselage
The next project was to improve the way the tail electrical conduit was mounted to the aft bulkhead. Previously, I'd attached it with a couple of zip-ties around a bulkhead fitting, but this particular support needs to be absolutely, positively secure, and for a good long time. Once the empennage is mounted permanently, this area will be hard to get to, and the conduit is above the right rudder cable. I fabricated an angle bracket and, with the help of my friend Bill, attached it to a nearby bulkhead and bolted a good old Adel clamp to it. That conduit isn't going anywhere. My mind is now completely at ease about that installation.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.